O
Long Beach
← Long Beach

Long Beach · issues

Civic issues

Topics getting the most attention in Long Beach public meetings, ranked by how frequently they come up.

29 issues (filtered)18 topics
HighWater Utilities

Homelessness and health grant funding

Multiple grants are up for acceptance — $11 million for Continuum of Care homeless services, $7.3 million for Black Infant Health, plus youth homelessness and other health program funding. Mostly state and federal money flowing into local services.

1 mention (1 this month)Last discussed Nov 10, 2026
HighWater Utilities

Port of Long Beach Water System Transfer

An amended agreement between the Harbor and Utilities boards would move portions of the Port's water distribution system to the utilities side. It's a behind-the-scenes asset shuffle that affects who runs which water pipes.

3 mentions (1 this month)Last discussed Nov 5, 2026
HighWater Utilities

Groundwater Treatment Plant valve rehabilitation

A $3.6 million construction contract and a $782,684 construction management contract support Phase 2 of valve rehabilitation at the Groundwater Treatment Plant, which treats a key share of the city's drinking water.

1 mention (1 this month)Last discussed Nov 5, 2026
HighWater Utilities

State water conservation mandates

The state's 'Making Water Conservation a California Way of Life' framework kicks in for compliance in 2027, and Long Beach utilities will need to hit multiple milestones on indoor, outdoor, and water-loss standards.

3 mentions (1 this month)Last discussed Oct 15, 2026
HighWater Utilities

FY 2026 water and sewer capital program

A $1.6 million contract keeps the ongoing sewer rehabilitation and replacement program moving, reducing the risk of spills and failures in aging pipes.

2 mentions (1 this month)Last discussed Oct 15, 2026
HighWater Utilities

Haynes pipeline delay and Seal Beach franchise dispute

Construction began in May to supply recycled water to LADWP's Haynes Generating Station, which must stop using ocean water for cooling by 2029. The plant could use up to a third of the city's recycled water, prompting exploration of additional supply from the Los Coyotes reclamation plant.

2 mentions (1 this month)Last discussed Oct 15, 2026
HighWater Utilities

FY 2026-27 water and sewer rate increases

A $1.6 million contract keeps the ongoing sewer rehabilitation and replacement program moving, reducing the risk of spills and failures in aging pipes.

10 mentions (1 this month)Last discussed Oct 8, 2026
HighWater Utilities

Pilot hygiene project siting

A $50,000 Mayor's Fund pilot will fund portable restroom/hygiene services for unhoused residents. The subcommittee wants staff to identify high-need 'hot spot' areas rather than defaulting to the Multi-Service Center, weighing overnight accessibility and transit barriers.

1 mentionLast discussed Sep 21, 2026
HighWater Utilities

Orange Avenue water transmission main replacement

An 80-year-old water main on Orange Avenue that broke twice in 2024 will be replaced using trenchless pipe bursting — faster, quieter, and about half the cost of digging up the street. Construction runs September through November 2026, with temporary parking impacts along the route.

3 mentionsLast discussed Sep 17, 2026
HighWater Utilities

Signal Hill groundwater delivery agreement

Long Beach will pump groundwater using Signal Hill's water rights and deliver it to Signal Hill, splitting the savings between the two cities. Revenue generated should help reduce costs for Long Beach ratepayers.

2 mentionsLast discussed Sep 17, 2026
HighWater Utilities

Groundwater Resilience Program feasibility study

Long Beach is taking a major step toward relying less on imported water by studying a new groundwater treatment plant and pipelines connecting its two water zones. Commissioners called it future infrastructure that will outlive them all.

4 mentionsLast discussed Sep 17, 2026
HighWater Utilities

2026 Water Resources Plan

The city's roadmap for water supply through 2050 was received and filed. It centers on the Groundwater Resilience Program, buying additional groundwater rights, and new recycled water from the Los Coyotes plant, with imported water, pure water, and brackish desalination as longer-term options.

6 mentionsLast discussed Sep 17, 2026
HighWater Utilities

2025 Water Distribution System Master Plan Update

The parks department's spending and revenue are both on track at about 33% of budget, and water use is running well below last year — good news for taxpayers and conservation.

3 mentionsLast discussed Sep 3, 2026
HighWater Utilities

First strategic plan for merged Long Beach Utilities

The utility is developing its first strategic plan since water, gas, and sewer operations merged. Commissioners and staff spent the retreat identifying shared vision, mission, values, and priorities, with a final plan expected in spring 2027.

1 mentionLast discussed Sep 3, 2026
HighWater Utilities

Gas utility future and affordability pressures

Consultants and staff flagged declining gas consumption, rates pegged to SoCal Gas, and a roughly $20 million annual transfer to the city's general fund as major pressures. There's no long-term plan for the gas utility's future amid electrification and climate goals, though opportunities exist in fuel cells and industrial customers.

1 mentionLast discussed Sep 3, 2026
HighWater Utilities

Parks water use and conservation

Water spending is down (62% of a $3.2M budget), but commissioners warned hot, dry weather could drive costs up and they want to avoid the brownouts seen during past droughts.

2 mentionsLast discussed Aug 20, 2026
HighWater Utilities

Dredging project approval and October start

The City Council approved the Marine Bureau's dredging project, with the contract awarded and work targeted to begin in mid-October — an aggressive timeline staff says everyone is on board for.

3 mentionsLast discussed Aug 13, 2026
HighWater Utilities

Colorado River shortage framework

The federal government issued an environmental impact statement framework for Colorado River operations, with shortages likely — Arizona would bear early cuts starting 2028. The river delivered only 3.5 million acre-feet this year against an 11–12 million average need. Long Beach's imported water supply could be affected.

1 mentionLast discussed Aug 6, 2026
HighWater Utilities

Campus Realignment and Modernization

The utility department operates out of three aging campuses and is studying consolidating into one modern facility. Early modeling suggests keeping the land, ground-leasing it for industrial use, and renting office space nearby could get close to cost-neutral for ratepayers — but the numbers are very rough and decisions are months away.

5 mentionsLast discussed Aug 6, 2026
HighWater Utilities

Groundwater resilience program and Pure Water Southern California

The commission backed Metropolitan Water District's massive water recycling project, which would convert highly treated wastewater into drinking-quality supply. Long Beach has a contract for about 4,000 acre-feet, supporting groundwater resilience in west Long Beach.

3 mentionsLast discussed Aug 6, 2026
HighWater Utilities

Large valve replacement program

Aging gate valves from 1948-1962 are being replaced with modern butterfly valves at four locations, cutting valve operating time nearly in half during main breaks and shrinking the areas affected by shutdowns. Construction starts in April with traffic control at each site.

2 mentionsLast discussed Jul 16, 2026
HighWater Utilities

Drought and Climate Action Plan progress

The city reported 2025 drought accomplishments under its Climate Action Plan, including water efficiency rebates, ocean-friendly gardens, and green space projects. The Utilities Department is planning a major expansion of local groundwater and recycled water supplies.

1 mentionLast discussed Jun 25, 2026
HighWater Utilities

Water supply pathways for 2050 reliability

A wet winter has pushed the local groundwater basin to about 99% of its optimum level, and Metropolitan may end the year with surplus supplies. But a warm winter left the Sierra snowpack at just 43% of normal, limiting how much of this year's precipitation becomes stored water.

4 mentionsLast discussed Jun 18, 2026
HighWater Utilities

LADWP Haynes Generating Station pipeline improvements

Long Beach is managing recycled water, sewer, and now potable water pipeline projects to serve the Haynes power plant as it phases out ocean cooling by 2029. LADWP pays all costs, and the work could create recycled water connections for future city customers.

1 mentionLast discussed Jun 18, 2026
HighWater Utilities

On-call emergency water and sewer repair contracts

Four contractors are now on standby to fix water main breaks, sewer collapses, and sinkholes quickly, with $6 million total capacity over two years. This keeps emergency response fast when pipes fail in neighborhoods.

1 mentionLast discussed Jun 18, 2026
HighWater Utilities

2025 Urban Water Management Plan

The state requires a five-year update showing Long Beach can supply water through 2050, even in droughts. The plan forecasts reliability thanks to record Metropolitan storage, and includes a water shortage contingency plan with staged irrigation cuts if shortages hit.

2 mentionsLast discussed Jun 4, 2026
HighWater Utilities

Olympic-era sewer and water capital projects

The Infrastructure Committee reviewed sewer and water projects near Olympic venues and travel corridors — previously planned but fast-tracked to avoid disruptions during the 2028 Games. Outreach to nearby residents and businesses will come closer to construction.

2 mentionsLast discussed Jun 4, 2026
HighWater Utilities

Colorado River supply stress

The MWD board adopted its budget with a 6.2% water rate increase, which will factor into Long Beach's FY 2027 budget. Commissioner Cordero reported Colorado River conditions are dire, with possible litigation over Lake Mead allocations.

3 mentionsLast discussed May 14, 2026
HighWater Utilities

Verizon wireless facilities at marina sites

Verizon plans to present proposals for cell equipment at the Alamitos Bay lot and the dry storage/impound yard to boost capacity around the 2028 Olympic venues. Commissioners raised questions about Olympic sponsorship conflicts and Coastal Commission review.

3 mentionsLast discussed May 7, 2026